Facilities

Production facilities

Robotic pretreatment, carrier plating, continuous filtration, trivalent chrome plating and post-treatment.

Actual robotic pretreatment line
Actual robotic pretreatment line

Robotic pretreatment

Robots handle rinsing and transfer between process stages. Treatment time, temperature and robot movement follow set conditions.

Line scope & control details
Processes
  • Pretreatment (activation / cleaning / conditioning)
  • Standard transfer & time control
Controls
  • Standard recipes for time · temperature · concentration
  • Standardized sampling location/time
Inspection
  • Appearance
  • Adhesion (as needed)
  • Process history
Acid copper carrier plating line
Acid copper carrier plating line

Large carrier line

Carrier lines handle acid copper and nickel plating. Coating thickness and appearance are controlled to the part specification.

Line scope & control details
Processes
  • Acid copper (leveling base build)
  • Semi-bright nickel (base)
  • Bright nickel (top)
Controls
  • Current / voltage / time control
  • Rinse & drag-out management
Inspection
  • Thickness
  • Appearance
  • Adhesion
  • Corrosion (as required)
Long-life continuous filtration equipment
Long-life continuous filtration equipment

Long-life filtration

Continuous filtration removes particles and suspended matter from the bath to help reduce specks, haze and stains on matte finishes.

Line scope & control details
Processes
  • Matte / satin nickel
  • Continuous long-life filtration (cleanliness control)
Controls
  • Turnover (circulation rate) criteria
  • Replace/clean when ΔP rises
Inspection
  • Appearance
  • Color deviation check
  • Process history
Trivalent chromium plating tank
Trivalent chromium plating tank

Trivalent chrome & post-treatment

Trivalent chrome plating is followed by passivation. Appearance and corrosion resistance are tested to the part specification.

Line scope & control details
Processes
  • Trivalent chromium plating (Cr3+)
  • Post-treatment (passivation)
Controls
  • Maintain bath conditions (temperature/pH/concentration)
  • Standardize post-treatment time · concentration · agitation
Inspection
  • Corrosion (salt spray / CASS as required)
  • Appearance
  • Process history
Information availability

Contact us for facility photos, specifications and available tests. Send the part drawing and required test conditions so we can review your request.

Contact us